NORTH AMERICA
Media Center

Feedwater Heater Replacement

As U.S. utilities seek plant life extension to 60 years and beyond, managing aging components becomes critical to sustained operational excellence. And as utilities move forward with feedwater heater (FWH) replacements, AREVA understands the need for a partner who can offer a flexible yet comprehensive package that ensures safety, quality, and delivery on-time and on-budget for critical path activities. AREVA can tailor a solution to meet your needs, as we understand that there are multiple options for addressing feedwater heater replacement across the industry.

The Right Team. Industry-Leading Expertise. Committed to Excellence.

Integrated Solutions

Leverage the powerful know-how of AREVA and our joint venture engineering, procurement and construction (EPC) teams. We will work with you to determine the right strategy, skill sets and strengths — in all phases of design and replacement. The combination of engineering, product and field services capabilities allows AREVA to deliver a customized and complete solutions package to you.

AREVA's Delivery Options

  • Construction
  • Design Specifications
  • Disposal
  • Engineering Change Packages
  • Engineering Analysis
  • Heavy Rigging
  • Procurement
    – Specifications
    – Components
  • Transport

Expertise

  • Coordination of workflow with multiple suppliers
  • Engineering analysis and design change packages
  • Proven project performance to date
  • Project management and coordination
  • Seamless interface with utility site teams
  • Site implementation / operations
    – Machining and welding
    – NDE and eddy current
    – Chemistry
  • Team experience with FWH replacements and Steam Generating Team (SGT) large component replacements

Benefits

  • Control of total process and overall project schedule
  • Lessons learned database from past major component replacement projects
  • Precision measurements to ensure first-time fit-up accuracy and minimize schedule
  • Transparent and comprehensive offer for your FWH replacement
  • Unsurpassed experience for major component replacements

Major Component Replacement Portfolio

  • Feedwater heaters
  • Integrated head assemblies (10)
  • Pressurizers
  • Original and replacement reactor vessel closure heads (156)
  • Steam generators (24)